1993-1994
Site investigation and geological-geotechnical consultancy for the stabilization of a slope subjected to a landslide in Silla, near Porretta Terme (Bo) – Contractor: Local Employers’Association
1995
Site investigation for the stabilization of a slope and the restoration of SS 64 road blocked by a landslide in Marano – Contractor: A.N.A.S. Bologna
1996
Geophysical investigation (electrical log and seismic survey) for the extension and the reinforcement plan of the SS 64 road – Contractor: A.N.A.S. Bologna
1998-2001
Monitoring and data assessment in the tunnel entrance and dumping grounds of the High-Speed Railway Bologna-Firenze, using static assessment instruments – Contractor: CGG S.r.l.
2003
Thorough site investigation for the reinforcement on a viaduct located near Ascoli Piceno (Quintodecimo) - Contractor: A.N.A.S. COMPARTIMENTO MARCHE
2004
Site investigation for slope stability analysis in the building of a new penstock in the Talamona hydroelectric plant (SO) – Contractor: PARESA S.p.a.
2004-2008
Inclinometers and piezometers data processing was used to control retaining walls statics of the new underground parking “ex Manifattura Tabacchi” BOLOGNA – Contractor: ASTALDI S.p.a.
2004-2008
Site investigation for the building of railway underpasses (Reggio Emilia, Modena, Bologna) – Contractor: BARALDINI S.p.a.
2006
Geophysical investigation (seismic reflection techniques) for the plan of the new road system leading to the Riolo Terme dump (FC) – Contractor: SITEC S.r.l.
2006-2007
Geotechnical and environmental investigation works for the building of two school districts in Bologna – Contractor: COMUNE DI BOLOGNA
2008
Placing of piezometer systems near Castel Maggiore (BO) to install wellpoints for the building of a railway underpass – Contractor: SO.CO.GEN. S.p.a.
2008
Detailed site investigation to consolidate the railway embankment used for freight transport, running around Bologna – Contractor: R.F.I. (ITALIAN RAILWAYS) S.p.a
2009
Detailed site investigation and geological-geotechnical consultancy for the design and realization of 12 buildings in Milano (EXPO 2015) – Contractors: DON MINZONI S.r.l. – EST.CAPITAL.S.p.a.
2009
Geophysical investigation using electrical tomography and seismic refraction techniques with tomographic data processing to design a new pipe-line. CASTOR UGS plan, SPAIN – Contractor: G.A.S. S.p.a.
2010
A geological report with seismic microzoning integration for the design and realization of an important stock in bulk (COMET S.p.a.) – Contractor: GRANDE SOLE S.r.l.